---
title: "What Key Items Must a Valid Injection Molding Cavity Test Report Include?"
description: "New OEM plastic product launches often face unvalidated cavity performance risks that cause mass production defects and launch delays. Standardized cavity test reports covering dimensional accuracy, material compatibility, and cycle stability, paired with clear compliance documentation checks, reduce production risks and speed up time-to-market for consumer goods projects."
url: "https://www.ok-tool.com/qa/valid-injection-molding-cavity-test-report-key-items.html"
language: "en"
type: "Q&A"
category: "Injection Molding Q&A"
datePublished: "2026-09-28"
dateModified: "2026-09-28"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 7
---

# What Key Items Must a Valid Injection Molding Cavity Test Report Include?

## Question

 I’m a product development manager at a mid-sized consumer goods brand, and I’m currently pushing our new food-safe reusable food storage container line through OEM sample validation with a Zhejiang-based injection molder. We received first-shot samples from the 8-cavity mold last week, but the supplier only shared a basic hand-measured dimensional check sheet for 2 sample parts per cavity, with no formal cavity test report included. Our internal quality team is pushing back on tooling sign-off, saying we need full cavity validation before we lock in mass production plans—especially since we noticed 0.12mm wall thickness variation between cavity 3 and cavity 7 in the first sample batch, which could affect seal performance. We have a major retail launch deadline in 12 weeks, and our retail partner requires all quality validation documentation for their vendor audit in 4 weeks. I’m not clear on exactly what a complete, compliant cavity test report should cover, what industry standards apply for food-contact plastic parts, how to verify the supplier’s test data is legitimate, and which risks we’d face if we move forward with partial data to save time. I need clear, actionable guidance on what to require from the supplier to keep the project on track without cutting critical quality corners. 

## Answers
                            
### Answer 1 — Best Answer

Cavity test reports exist to verify that every individual cavity in a multi-cavity mold produces parts that consistently meet design, functional, and regulatory requirements, rather than relying on sample parts from a small subset of cavities. For food-contact consumer goods like your storage containers, this validation is critical for two overlapping reasons: first, it ensures consistent functional performance (like seal integrity and stackability) across all units produced, and second, it confirms that material distribution and surface finish are uniform enough to meet food-safety regulatory standards, without hidden defects that could trap food debris or leach additives unevenly. The core standard for a valid report is that it reflects steady-state production conditions, not the initial first-shot samples that are often run with adjusted parameters to get the mold working.

To evaluate whether a supplier’s cavity test report is sufficient, start with sample collection parameters. **Minimum 5 consecutive production shots per cavity, pulled after the mold has run for at least 30 minutes at the planned mass production cycle time**, is the baseline for valid data—first-shot parts are not representative, as they are produced while the mold is still reaching thermal equilibrium. Next, verify that all critical test items are included: full dimensional inspection of all critical and major dimensions (including wall thickness, seal groove depth, and lid fit tolerances), functional performance testing (seal pressure test, drop test from 1m for filled containers), material consistency checks (melt flow index and FTIR scan per cavity to rule out material degradation from uneven heating), and visual defect inspection per AQL 2.5 for critical food-contact surfaces. To confirm data legitimacy, ask for raw measurement files from CMM or caliper systems, not just a summarized pass/fail sheet, and check that test personnel have documented training in dimensional inspection for plastic parts. For food-contact applications, confirm that any third-party testing used is done by an ISO 17025 accredited lab with food-contact plastic testing scope.

A complete, audit-ready cavity test report package includes six core components: a cover page with mold ID, cavity numbering schematic, test date, and listed production parameters (cycle time, barrel temperature profile, holding pressure) during sample collection; a full dimensional data table with measured values for every critical and major dimension per cavity, compared against drawing tolerances; functional test results with clear pass/fail criteria per cavity; material consistency test data per cavity; a section documenting any out-of-spec cavities and corresponding corrective actions (like steel safe adjustments or polishing); and a signed approval from the supplier’s quality management representative. For your retail audit, you will need to cross-reference this report against the final mold design drawing, material batch certification, and your product performance specification to confirm full alignment. If the supplier has made modifications to any cavities after the first sample run, they must provide a separate re-test report for the adjusted cavities to prove performance meets specs post-modification—relying on original first-shot data for modified cavities is a common gap that triggers audit findings.

The most common compliance risk is relying on first-shot sample data instead of steady-state production data, which leads to 25-35% higher defect rates once mass production ramps up, as cavities that perform marginally during initial runs start producing out-of-spec parts under consistent cycle conditions. Another frequently overlooked risk is **uneven cavity cooling causing variable material crystallinity**, which impacts both structural durability and food-contact compliance—cavities with slower cooling can have higher additive leaching levels that fail FDA or EU food-contact tests, even if dimensional specs are met. For your project, skipping full cavity validation also carries commercial risk: if your retail partner’s audit finds incomplete validation documentation, you could face a 4-6 week launch delay and penalty fees of up to 10% of the first order value for missed delivery windows. The final easy-to-miss detail is retaining raw test data alongside the summary report—many retail auditors will request raw CMM measurement logs or MFI test printouts to confirm the report was not falsified, and suppliers that cannot provide this data almost always have unaddressed cavity defects they are attempting to hide.

**status:** accepted
**Author:** David Zhang
**Date:** 2026-09-28

### Answer 2

When reviewing cavity test data, it’s critical to look beyond individual part dimensional specs and validate cross-cavity assembly performance and real-world use conditions, especially for paired parts like container bases and lids. Many suppliers only test parts from the same cavity as a matched set, but in mass production, lids and bases will be randomly paired from all 8 cavities, so even small dimensional variations across cavities can lead to consistent seal failures.

The cavity test report should include data from at least 20 random cross-cavity assembly pairs, tested for seal integrity under 5kPa of internal pressure, to confirm that any combination of parts from different cavities meets performance requirements. It’s also important to include accelerated thermal cycling test results per cavity—10 cycles between -20°C and 80°C, followed by dimensional re-check and seal testing—to catch warpage or material stress issues that only appear after typical consumer use like dishwasher cycles or freezer storage. These issues are rarely caught in initial first-shot testing, but they account for 60% of field return complaints for food storage container products.

**status:** suggested
**Author:** Jason Zhou
**Date:** 2026-09-28

### Answer 3

Cavity-to-cavity variation often creates unexpected packaging and transit issues that don’t show up in standard dimensional or functional tests, so it’s worth verifying these factors are covered in your test report scope. Even 0.1mm of excess wall thickness on parts from a single cavity can cause jams on automated blister packaging lines, or prevent parts from fitting into pre-designed retail display trays, leading to thousands of dollars in rework and packaging line downtime.

The report should include packaging compatibility data for each cavity: at least 10 parts per cavity packed in your final retail packaging, run through ISTA 3A transit vibration and drop tests, to confirm no parts crack or warp during shipping, and that all parts fit correctly in packaging without forcing. You should also check for surface finish consistency across cavities, as uneven polish or gate vestige variation can cause retail labels to peel off prematurely, which is a common retail audit failure point that rarely gets included in basic cavity validation checklists.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-09-28

### Answer 4

For food-contact consumer goods, cavity test reports are a core requirement for regulatory market entry, and gaps in cavity-level data can lead to customs holds or mandatory product recalls, even if overall part specs are met. For the US market, FDA food-contact regulations require extractable and leachable testing to be representative of all production cavities, not just a small sample set, because uneven cavity surface finish or cooling can cause variable additive leaching levels that exceed safe limits.

For EU market entry, EU 10/2011 requires traceable documentation linking every production cavity to material batch test data and overall compliance declarations. The report should also include specific checks for sharp edges or flash on food-contact surfaces per cavity, as even 0.05mm of flash from a single defective cavity can create a choking hazard that triggers mandatory recall reporting under CPSC rules. Make sure the report includes unique identifiers for each cavity and the mold serial number, so you can tie compliance data directly to production units for audit and traceability purposes.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-09-28

### Answer 5

Cavity test data has a direct impact on long-term production costs, so reviewing the report against the supplier’s mass production quote can help you avoid unexpected cost overruns later in the project. First, check if the report includes per-cavity scrap rate data from the test run—if 2 out of 8 cavities have a scrap rate 10% higher than the others, the supplier’s quoted per-unit cost, which is likely based on an average 3% scrap rate, will be inaccurate, and you could face price increases or hidden cost shifts once mass production starts.

You should also compare the cycle time used during the cavity test run to the cycle time listed in the supplier’s quote: if the test required a 5-second longer cooling cycle to eliminate sink marks on 3 cavities, that increases per-unit production cost by 7-9% due to lower hourly output. Finally, look for data on cavity wear or surface finish degradation during the test run—cavities that show early wear will require more frequent polishing and maintenance, increasing annual tooling upkeep costs by 15-20% over the mold’s lifetime.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-09-28

### Answer 6

A high-quality cavity test report doesn’t just validate current cavity performance—it also lays the groundwork for consistent quality control during mass production, so you should check for actionable inspection and corrective action details alongside pass/fail data. First, verify that the report includes a gage R&R (gage repeatability and reproducibility) score of at least 80% for all critical measurement tools used, to confirm that the test data itself is reliable and not skewed by measurement error. Next, review the corrective action section for any out-of-spec cavities: permanent fixes like steel safe adjustments or cavity polishing are far more reliable than temporary parameter tweaks, which can drift during long production runs as the mold heats up or material batch properties shift.

The report should also include a recommended cavity-specific inspection plan for mass production: for cavities that fall within 10% of tolerance limits, IPQC checks should be scheduled every 2 hours instead of the standard 4-hour interval, to catch dimensional drift early before it leads to large batches of defective parts. Defect classification should also be tied to specific cavity failure modes, so line operators can quickly identify which cavity is producing defects and shut it down for adjustment without stopping the entire mold.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-09-28

### Answer 7

If you’re working under a tight launch timeline, you can use targeted cavity testing to reduce pre-production risk and keep the project on track without waiting for a full formal report first. Start by prioritizing the 2 cavities that showed the largest wall thickness variation (cavity 3 and 7) for immediate steady-state testing: pull 5 consecutive shots from each at the planned mass production cycle time, and run full dimensional and seal tests to determine if the variation is a minor first-shot anomaly or a permanent cavity issue that needs tooling adjustments. This targeted test takes only 1-2 days, and it lets you start addressing any critical issues immediately while the supplier runs full tests on the remaining 6 cavities.

You can also use preliminary cavity test data to select the 2-3 most consistent cavities for early marketing and retail sample production, so you can get samples to your retail partner for their launch planning without waiting for all 8 cavities to be fully validated. Just make sure to document that these early samples are for evaluation only, not for sale, to avoid compliance issues. The full cavity test report should still be completed before you sign off on mass production, but this phased approach can cut 3-5 days off your pre-production timeline.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-09-28

## Related Resources

- [Injection Molding Q&A](https://www.ok-tool.com/qa/injection-molding/)
- [Plastic Injection Molding](https://www.ok-tool.com/capabilities/plastic-injection-molding/)
- [Injection Molding Guide](https://www.ok-tool.com/manufacturing/injection-molding/)
- [Injection Molding Buying Guides](https://www.ok-tool.com/buying/injection-molding/)
- [Products](https://www.ok-tool.com/products/)
- [Custom Manufacturing](https://www.ok-tool.com/custom-manufacturing/)
- [Manufacturing Knowledge Base](https://www.ok-tool.com/knowledge/)
- [Injection Molding](https://www.ok-tool.com/knowledge/injection-molding/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What Key Items Must a Valid Injection Molding Cavity Test Report Include?",
        "text": "I’m a product development manager at a mid-sized consumer goods brand, and I’m currently pushing our new food-safe reusable food storage container line through OEM sample validation with a Zhejiang-based injection molder. We received first-shot samples from the 8-cavity mold last week, but the supplier only shared a basic hand-measured dimensional check sheet for 2 sample parts per cavity, with no formal cavity test report included. Our internal quality team is pushing back on tooling sign-off, saying we need full cavity validation before we lock in mass production plans—especially since we noticed 0.12mm wall thickness variation between cavity 3 and cavity 7 in the first sample batch, which could affect seal performance. We have a major retail launch deadline in 12 weeks, and our retail partner requires all quality validation documentation for their vendor audit in 4 weeks. I’m not clear on exactly what a complete, compliant cavity test report should cover, what industry standards apply for food-contact plastic parts, how to verify the supplier’s test data is legitimate, and which risks we’d face if we move forward with partial data to save time. I need clear, actionable guidance on what to require from the supplier to keep the project on track without cutting critical quality corners.",
        "answerCount": 7,
        "upvoteCount": 5,
        "datePublished": "2026-09-28T00:56:22Z",
        "dateModified": "2026-09-28T01:05:15Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.ok-tool.com/qa/valid-injection-molding-cavity-test-report-key-items.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "Cavity test reports exist to verify that every individual cavity in a multi-cavity mold produces parts that consistently meet design, functional, and regulatory requirements, rather than relying on sample parts from a small subset of cavities. For food-contact consumer goods like your storage containers, this validation is critical for two overlapping reasons: first, it ensures consistent functional performance (like seal integrity and stackability) across all units produced, and second, it confirms that material distribution and surface finish are uniform enough to meet food-safety regulatory standards, without hidden defects that could trap food debris or leach additives unevenly. The core standard for a valid report is that it reflects steady-state production conditions, not the initial first-shot samples that are often run with adjusted parameters to get the mold working. To evaluate whether a supplier’s cavity test report is sufficient, start with sample collection parameters. Minimum 5 consecutive production shots per cavity, pulled after the mold has run for at least 30 minutes at the planned mass production cycle time , is the baseline for valid data—first-shot parts are not representative, as they are produced while the mold is still reaching thermal equilibrium. Next, verify that all critical test items are included: full dimensional inspection of all critical and major dimensions (including wall thickness, seal groove depth, and lid fit tolerances), functional performance testing (seal pressure test, drop test from 1m for filled containers), material consistency checks (melt flow index and FTIR scan per cavity to rule out material degradation from uneven heating), and visual defect inspection per AQL 2.5 for critical food-contact surfaces. To confirm data legitimacy, ask for raw measurement files from CMM or caliper systems, not just a summarized pass/fail sheet, and check that test personnel have documented training in dimensional inspection for plastic parts. For food-contact applications, confirm that any third-party testing used is done by an ISO 17025 accredited lab with food-contact plastic testing scope. A complete, audit-ready cavity test report package includes six core components: a cover page with mold ID, cavity numbering schematic, test date, and listed production parameters (cycle time, barrel temperature profile, holding pressure) during sample collection; a full dimensional data table with measured values for every critical and major dimension per cavity, compared against drawing tolerances; functional test results with clear pass/fail criteria per cavity; material consistency test data per cavity; a section documenting any out-of-spec cavities and corresponding corrective actions (like steel safe adjustments or polishing); and a signed approval from the supplier’s quality management representative. For your retail audit, you will need to cross-reference this report against the final mold design drawing, material batch certification, and your product performance specification to confirm full alignment. If the supplier has made modifications to any cavities after the first sample run, they must provide a separate re-test report for the adjusted cavities to prove performance meets specs post-modification—relying on original first-shot data for modified cavities is a common gap that triggers audit findings. The most common compliance risk is relying on first-shot sample data instead of steady-state production data, which leads to 25-35% higher defect rates once mass production ramps up, as cavities that perform marginally during initial runs start producing out-of-spec parts under consistent cycle conditions. Another frequently overlooked risk is uneven cavity cooling causing variable material crystallinity , which impacts both structural durability and food-contact compliance—cavities with slower cooling can have higher additive leaching levels that fail FDA or EU food-contact tests, even if dimensional specs are met. For your project, skipping full cavity validation also carries commercial risk: if your retail partner’s audit finds incomplete validation documentation, you could face a 4-6 week launch delay and penalty fees of up to 10% of the first order value for missed delivery windows. The final easy-to-miss detail is retaining raw test data alongside the summary report—many retail auditors will request raw CMM measurement logs or MFI test printouts to confirm the report was not falsified, and suppliers that cannot provide this data almost always have unaddressed cavity defects they are attempting to hide.",
            "upvoteCount": 5,
            "url": "https://www.ok-tool.com/qa/valid-injection-molding-cavity-test-report-key-items.html#acceptedAnswer",
            "datePublished": "2026-09-28T01:53:05Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.ok-tool.com/team/david.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "When reviewing cavity test data, it’s critical to look beyond individual part dimensional specs and validate cross-cavity assembly performance and real-world use conditions, especially for paired parts like container bases and lids. Many suppliers only test parts from the same cavity as a matched set, but in mass production, lids and bases will be randomly paired from all 8 cavities, so even small dimensional variations across cavities can lead to consistent seal failures. The cavity test report should include data from at least 20 random cross-cavity assembly pairs, tested for seal integrity under 5kPa of internal pressure, to confirm that any combination of parts from different cavities meets performance requirements. It’s also important to include accelerated thermal cycling test results per cavity—10 cycles between -20°C and 80°C, followed by dimensional re-check and seal testing—to catch warpage or material stress issues that only appear after typical consumer use like dishwasher cycles or freezer storage. These issues are rarely caught in initial first-shot testing, but they account for 60% of field return complaints for food storage container products.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/valid-injection-molding-cavity-test-report-key-items.html#suggestedAnswer-2",
            "datePublished": "2026-09-28T01:44:01Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.ok-tool.com/team/jason.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Cavity-to-cavity variation often creates unexpected packaging and transit issues that don’t show up in standard dimensional or functional tests, so it’s worth verifying these factors are covered in your test report scope. Even 0.1mm of excess wall thickness on parts from a single cavity can cause jams on automated blister packaging lines, or prevent parts from fitting into pre-designed retail display trays, leading to thousands of dollars in rework and packaging line downtime. The report should include packaging compatibility data for each cavity: at least 10 parts per cavity packed in your final retail packaging, run through ISTA 3A transit vibration and drop tests, to confirm no parts crack or warp during shipping, and that all parts fit correctly in packaging without forcing. You should also check for surface finish consistency across cavities, as uneven polish or gate vestige variation can cause retail labels to peel off prematurely, which is a common retail audit failure point that rarely gets included in basic cavity validation checklists.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/valid-injection-molding-cavity-test-report-key-items.html#suggestedAnswer-3",
            "datePublished": "2026-09-28T01:34:01Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.ok-tool.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For food-contact consumer goods, cavity test reports are a core requirement for regulatory market entry, and gaps in cavity-level data can lead to customs holds or mandatory product recalls, even if overall part specs are met. For the US market, FDA food-contact regulations require extractable and leachable testing to be representative of all production cavities, not just a small sample set, because uneven cavity surface finish or cooling can cause variable additive leaching levels that exceed safe limits. For EU market entry, EU 10/2011 requires traceable documentation linking every production cavity to material batch test data and overall compliance declarations. The report should also include specific checks for sharp edges or flash on food-contact surfaces per cavity, as even 0.05mm of flash from a single defective cavity can create a choking hazard that triggers mandatory recall reporting under CPSC rules. Make sure the report includes unique identifiers for each cavity and the mold serial number, so you can tie compliance data directly to production units for audit and traceability purposes.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/valid-injection-molding-cavity-test-report-key-items.html#suggestedAnswer-4",
            "datePublished": "2026-09-28T01:28:44Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.ok-tool.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Cavity test data has a direct impact on long-term production costs, so reviewing the report against the supplier’s mass production quote can help you avoid unexpected cost overruns later in the project. First, check if the report includes per-cavity scrap rate data from the test run—if 2 out of 8 cavities have a scrap rate 10% higher than the others, the supplier’s quoted per-unit cost, which is likely based on an average 3% scrap rate, will be inaccurate, and you could face price increases or hidden cost shifts once mass production starts. You should also compare the cycle time used during the cavity test run to the cycle time listed in the supplier’s quote: if the test required a 5-second longer cooling cycle to eliminate sink marks on 3 cavities, that increases per-unit production cost by 7-9% due to lower hourly output. Finally, look for data on cavity wear or surface finish degradation during the test run—cavities that show early wear will require more frequent polishing and maintenance, increasing annual tooling upkeep costs by 15-20% over the mold’s lifetime.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/valid-injection-molding-cavity-test-report-key-items.html#suggestedAnswer-5",
            "datePublished": "2026-09-28T01:18:19Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.ok-tool.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "A high-quality cavity test report doesn’t just validate current cavity performance—it also lays the groundwork for consistent quality control during mass production, so you should check for actionable inspection and corrective action details alongside pass/fail data. First, verify that the report includes a gage R&amp;R (gage repeatability and reproducibility) score of at least 80% for all critical measurement tools used, to confirm that the test data itself is reliable and not skewed by measurement error. Next, review the corrective action section for any out-of-spec cavities: permanent fixes like steel safe adjustments or cavity polishing are far more reliable than temporary parameter tweaks, which can drift during long production runs as the mold heats up or material batch properties shift. The report should also include a recommended cavity-specific inspection plan for mass production: for cavities that fall within 10% of tolerance limits, IPQC checks should be scheduled every 2 hours instead of the standard 4-hour interval, to catch dimensional drift early before it leads to large batches of defective parts. Defect classification should also be tied to specific cavity failure modes, so line operators can quickly identify which cavity is producing defects and shut it down for adjustment without stopping the entire mold.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/valid-injection-molding-cavity-test-report-key-items.html#suggestedAnswer-6",
            "datePublished": "2026-09-28T01:15:02Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.ok-tool.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "If you’re working under a tight launch timeline, you can use targeted cavity testing to reduce pre-production risk and keep the project on track without waiting for a full formal report first. Start by prioritizing the 2 cavities that showed the largest wall thickness variation (cavity 3 and 7) for immediate steady-state testing: pull 5 consecutive shots from each at the planned mass production cycle time, and run full dimensional and seal tests to determine if the variation is a minor first-shot anomaly or a permanent cavity issue that needs tooling adjustments. This targeted test takes only 1-2 days, and it lets you start addressing any critical issues immediately while the supplier runs full tests on the remaining 6 cavities. You can also use preliminary cavity test data to select the 2-3 most consistent cavities for early marketing and retail sample production, so you can get samples to your retail partner for their launch planning without waiting for all 8 cavities to be fully validated. Just make sure to document that these early samples are for evaluation only, not for sale, to avoid compliance issues. The full cavity test report should still be completed before you sign off on mass production, but this phased approach can cut 3-5 days off your pre-production timeline.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/valid-injection-molding-cavity-test-report-key-items.html#suggestedAnswer-7",
            "datePublished": "2026-09-28T01:05:15Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.ok-tool.com/team/eric.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.ok-tool.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.ok-tool.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Injection Molding Q&A", "item": "https://www.ok-tool.com/qa/injection-molding/"}          ,{"@type": "ListItem", "position": 4, "name": "What Key Items Must a Valid Injection Molding Cavity Test Report Include?"}
      ]
    }
]
```