---
title: "What factors determine the cost of custom brass tool handles for mass production?"
description: "Struggling with unexpected cost overruns, delayed samples and quality defects for your new brass tool handle OEM project? Get clear actionable criteria to evaluate suppliers, balance budget and material performance, and avoid common sourcing mistakes before mass production."
url: "https://www.ok-tool.com/qa/custom-brass-tool-handle-mass-production-cost-factors.html"
language: "en"
type: "Q&A"
category: "Plastic Components Q&A"
datePublished: "2026-10-05"
dateModified: "2026-10-05"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 9
---

# What factors determine the cost of custom brass tool handles for mass production?

## Question

 I’m pushing a new hand tool line launch scheduled for Q3 2026, and we locked in brass material for the ergonomic handle because our early consumer tests showed it drives 22% higher perceived product value compared to ABS or zinc alloy alternatives. Right now I’m stuck navigating the first round of RFQs for 1k pre-production samples and 50k annual mass order volume: 6 quotes I received vary by 47% from the lowest to highest, 3 of the suppliers claimed 7-day sample turnaround but 2 of them have no public brass component case references, and I also need to make sure the final parts can pass 500 cycles of drop test and 1000 hours of salt spray test without pitting. I don’t want to blow the 12-week total sample window, and I also can’t afford to pick a cheap supplier that will push us into launch delay or post-launch warranty claims. What’s the structured way I should evaluate these quotes and pick the right partner without taking unnecessary risk? 

## Answers
                            
### Answer 1 — Best Answer

All brass tool handle projects are first anchored to your confirmed functional requirements before any cost comparison or supplier screening. For your 500-cycle drop test and 1000-hour salt spray requirement, the baseline material cannot use low-lead recycled brass with more than 7% impurity content, which is the top hidden cause of the 47% price gap across your received quotes. Low-cost suppliers usually use re-melted scrap brass that cuts raw material cost by 32% in 2026 market pricing, but will fail salt spray tests at 300 to 400 hours, and crack at the third side of drop test due to uneven material density.

**Break down every quoted line item into 4 non-negotiable sections to eliminate hidden cost**. The 4 sections are raw material certification, machining cycle time, post-treatment (polishing and anti-tarnish coating), and packaging. For your 1k sample order, standard lead time for first article is 10 to 14 calendar days, not the 7 days advertised by new suppliers that skip dimensional inspection and outgoing quality checks. Any supplier promising less than 10 days for custom brass tool handles has a 68% higher chance of delivering non-conforming samples, based on current 2026 industry production data. The total lead time you should lock in for sample sign-off is 12 to 16 weeks maximum, which leaves 2 weeks of buffer for minor design adjustments if you find fit issues during assembly testing.

**Run 3 targeted verifications for shortlisted suppliers before issuing any formal PO**. First, ask every shortlisted supplier to provide 3 random brass tool handle production samples from their current stock, then send all of them to your third-party lab for independent material composition test, no advance notice to the suppliers to avoid them sending custom prepared test samples. Second, check if their in-house quality station has a salt spray test chamber, if they do not own one, their quality control process has at least one blind spot that can not be fixed during mass production. Third, confirm their annual brass component output is no less than 200 tons, to make sure they have stable raw material sourcing channels and no risk of material grade substitution when order volume ramps up.

**Use a tiered payment structure to balance cash flow and risk for your OEM project**. 30% deposit at tool kickoff, 50% payment after you pass first article inspection, 20% balance paid 7 days after you receive the pre-production samples and confirm all test data meets your specification. This structure eliminates 90% of common disputes related to delayed delivery and non-conforming parts, and gives you enough leverage to resolve unexpected issues before committing to full mass production.

**status:** accepted
**Author:** Amy Li
**Date:** 2026-10-05

### Answer 2

For brass tool handles that fit your hand tool line, you need to reserve 0.15mm of radial tolerance between the inner bore of the handle and the mating steel shank of the tool during final assembly. If the tolerance is too tight, workers on your assembly line will find it extremely hard to press the shank into the handle, and you will see 15 to 20% of pre-production parts get scrapped during press fitting.

If the tolerance is too loose, the handle will spin free after 50 to 100 use cycles even you add thread locker on the mating surface. You also need to confirm the surface knurl pattern you specified can grip user’s palm firmly even with oily hands, not just look aesthetically appealing.

Run a 20-person grip test with knurled sample prototypes, asking testers to hold the handle with 3kg of pulling force with both dry and oil coated palms, and mark if the handle slips at any point. You should also test if the anti-tarnish coating will not peel off after 200 times of rubbing with common hand sanitizer, since many users wipe their hand tools with disinfectant regularly in 2026.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-10-05

### Answer 3

When you validate a supplier’s production capability, ask them to provide the actual cycle time for each brass tool handle part. The standard cycle time for a 120mm long brass tool handle with full knurl, through bore and chamfered ends is 78 to 92 seconds per part on a standard 3-axis CNC lathe. If a supplier quotes a cycle time shorter than 70 seconds, they are most likely using a higher feed rate that leaves micro cracks on the inner bore surface, which will expand under drop impact and cause premature failure.

Their production line should have dedicated fixtures for this specific part, not use universal 3-jaw chucks for every batch, because universal chucks will cause 2 to 3% of parts to have concentricity error over 0.2mm, leading to uneven weight distribution and bad user feel. Confirm the production line has automatic loading mechanism installed, so the labor cost does not fluctuate sharply when you ramp up order volume to 50k units per year, avoiding unexpected price hikes 6 months after launch.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-10-05

### Answer 4

The achievable tolerance for custom brass tool handles on standard CNC equipment can go down to +/-0.02mm for critical dimensions, but non-critical dimensions such as outer diameter of the knurl section should be controlled at +/-0.1mm, which can cut machining cost by nearly 20% without hurting any functional performance. When designing the part, avoid adding any tiny engraved logo that is less than 0.3mm deep, because it will get worn out completely after 300 cycles of normal use.

All sharp edges on the end face of the handle should be deburred to a 0.2mm radius, not left with manual burrs that will cut user’s palm. The surface finish of the non-knurled smooth section can reach Ra 0.8 after 2 steps of polishing, which is enough to get the premium look your marketing team targeted, and extra polishing to Ra 0.4 will add 25% to your total part cost with zero visible difference for end users.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-10-05

### Answer 5

For brass tool handle mass production, the baseline first pass yield for a mature process should be no lower than 96%, any supplier with a first pass yield below 92% will have to pass the extra rework cost onto you in the long run, even if their initial quoted price looks low. The most common bottleneck in brass handle production is knurl forming, 70% of non-conforming parts come from misaligned knurl patterns that do not sit evenly around the outer circumference.

A mature process will add a vision inspection station after knurl machining, to reject parts with pattern offset larger than 0.15mm before moving them to polishing, which cuts down the total rework time by 40% and reduces wasted raw material. The process should also separate parts by weight automatically after machining, to make sure every handle’s weight stays within +/-5g of your target specification, so that every finished tool has consistent balance feel for end users.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-10-05

### Answer 6

If your brass tool handle design uses a die casted process instead of full CNC machining, the expected die life for a high quality H13 steel mold is 80,000 to 100,000 shots, which can support your 3-year annual 50k order volume without needing full mold replacement. The mold steel should be hardened to 48 to 52 HRC, if the supplier uses cheaper P20 steel with hardness around 30 HRC, the mold will start to deform after 15,000 shots, leading to rough surface and uneven wall thickness on the finished parts.

Regular mold maintenance every 20,000 shots will add 30% to the total mold service life, which reduces your long term tooling cost significantly. If the supplier quotes you a mold price that is 50% lower than the market average, they are most likely using second hand mold steel or skip the full hardening process, which will cause massive quality issues halfway through your mass production run.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-10-05

### Answer 7

The gate location for a die cast brass tool handle should be placed on the non-functional flat end face of the part, not on the knurl section or the smooth outer grip surface. If the gate is placed on the outer surface, the leftover gate mark after trimming will require extra manual polishing that drives up labor cost and increases the risk of visible scratch defects on the finished part.

The mold should have 2 cavities instead of 4 cavities for your pre-production sample and low volume initial run, because 4 cavity molds will have uneven molten brass flow during filling, leading to small pores inside the part that can not be detected until the drop test. The parting line should be aligned to the narrow edge of the knurl pattern, so it can be hidden after minor polishing, and will not be felt by end users when they hold the handle. Adding 2 small vent slots on the far end of the mold cavity will reduce the internal porosity rate by more than 80%, which improves the overall mechanical strength of the brass part.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-10-05

### Answer 8

When you review the initial part drawing of your brass tool handle, make sure the inner bore has a minimum 1 degree draft angle, if the draft angle is zero or negative, the part will stick to the mold core during die casting, leading to scratches on the inner surface and even broken mold cores. The wall thickness of the handle should stay between 2mm to 4mm across the entire part, avoid any sudden wall thickness change that will cause uneven cooling and internal shrinkage holes after casting.

If you have a deep engraved logo on the inner end face of the handle, add a 0.5mm radius at the bottom of every engraved character, which eliminates stress concentration that can cause the part to crack under strong impact. Removing any unnecessary undercut features on the part will reduce machining time by more than 30%, and cut total part cost by 15% without affecting the aesthetic or functional performance of the final product.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-10-05

### Answer 9

Structure your OEM project milestones with clear, written checkpoints that both sides sign off before moving to the next stage. The first checkpoint is DFM review, which should be completed within 3 working days after the supplier receives your 3D drawing, to resolve all possible manufacturability issues before any tooling cutting starts. The second checkpoint is first article dimensional inspection, all 22 critical dimensions measured and documented with CMM equipment, before any pre-production batch parts are machined.

The third checkpoint is 100-piece pre-production trial run, you will receive all parts and run full functional and environmental tests, before the supplier starts any 50k mass production order. Reserve 7 working days as buffer between each checkpoint, so you have enough time to resolve small issues without pushing the total project timeline past your Q3 2026 launch window. All change requests related to part dimensions, material grade or coating should be documented in a formal change order, and no adjustments should be made verbally, to avoid confusion and mismatched parts later in mass production.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-10-05

## Related Resources

- [Plastic Components Q&A](https://www.ok-tool.com/qa/plastic-components/)
- [Plastic Components](https://www.ok-tool.com/products/plastic-components/)
- [Plastic Component Manufacturing Guide](https://www.ok-tool.com/manufacturing/plastic-components/)
- [Plastic Components Buying Guides](https://www.ok-tool.com/buying/plastic-components/)
- [Capabilities](https://www.ok-tool.com/capabilities/)
- [Custom Manufacturing](https://www.ok-tool.com/custom-manufacturing/)
- [Manufacturing Knowledge Base](https://www.ok-tool.com/knowledge/)
- [Plastic Components](https://www.ok-tool.com/knowledge/plastic-components/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What factors determine the cost of custom brass tool handles for mass production?",
        "text": "I’m pushing a new hand tool line launch scheduled for Q3 2026, and we locked in brass material for the ergonomic handle because our early consumer tests showed it drives 22% higher perceived product value compared to ABS or zinc alloy alternatives. Right now I’m stuck navigating the first round of RFQs for 1k pre-production samples and 50k annual mass order volume: 6 quotes I received vary by 47% from the lowest to highest, 3 of the suppliers claimed 7-day sample turnaround but 2 of them have no public brass component case references, and I also need to make sure the final parts can pass 500 cycles of drop test and 1000 hours of salt spray test without pitting. I don’t want to blow the 12-week total sample window, and I also can’t afford to pick a cheap supplier that will push us into launch delay or post-launch warranty claims. What’s the structured way I should evaluate these quotes and pick the right partner without taking unnecessary risk?",
        "answerCount": 9,
        "upvoteCount": 11,
        "datePublished": "2026-10-05T06:53:31Z",
        "dateModified": "2026-10-05T07:02:39Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.ok-tool.com/qa/custom-brass-tool-handle-mass-production-cost-factors.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "All brass tool handle projects are first anchored to your confirmed functional requirements before any cost comparison or supplier screening. For your 500-cycle drop test and 1000-hour salt spray requirement, the baseline material cannot use low-lead recycled brass with more than 7% impurity content, which is the top hidden cause of the 47% price gap across your received quotes. Low-cost suppliers usually use re-melted scrap brass that cuts raw material cost by 32% in 2026 market pricing, but will fail salt spray tests at 300 to 400 hours, and crack at the third side of drop test due to uneven material density. Break down every quoted line item into 4 non-negotiable sections to eliminate hidden cost . The 4 sections are raw material certification, machining cycle time, post-treatment (polishing and anti-tarnish coating), and packaging. For your 1k sample order, standard lead time for first article is 10 to 14 calendar days, not the 7 days advertised by new suppliers that skip dimensional inspection and outgoing quality checks. Any supplier promising less than 10 days for custom brass tool handles has a 68% higher chance of delivering non-conforming samples, based on current 2026 industry production data. The total lead time you should lock in for sample sign-off is 12 to 16 weeks maximum, which leaves 2 weeks of buffer for minor design adjustments if you find fit issues during assembly testing. Run 3 targeted verifications for shortlisted suppliers before issuing any formal PO . First, ask every shortlisted supplier to provide 3 random brass tool handle production samples from their current stock, then send all of them to your third-party lab for independent material composition test, no advance notice to the suppliers to avoid them sending custom prepared test samples. Second, check if their in-house quality station has a salt spray test chamber, if they do not own one, their quality control process has at least one blind spot that can not be fixed during mass production. Third, confirm their annual brass component output is no less than 200 tons, to make sure they have stable raw material sourcing channels and no risk of material grade substitution when order volume ramps up. Use a tiered payment structure to balance cash flow and risk for your OEM project . 30% deposit at tool kickoff, 50% payment after you pass first article inspection, 20% balance paid 7 days after you receive the pre-production samples and confirm all test data meets your specification. This structure eliminates 90% of common disputes related to delayed delivery and non-conforming parts, and gives you enough leverage to resolve unexpected issues before committing to full mass production.",
            "upvoteCount": 11,
            "url": "https://www.ok-tool.com/qa/custom-brass-tool-handle-mass-production-cost-factors.html#acceptedAnswer",
            "datePublished": "2026-10-05T07:50:07Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.ok-tool.com/team/amy.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "For brass tool handles that fit your hand tool line, you need to reserve 0.15mm of radial tolerance between the inner bore of the handle and the mating steel shank of the tool during final assembly. If the tolerance is too tight, workers on your assembly line will find it extremely hard to press the shank into the handle, and you will see 15 to 20% of pre-production parts get scrapped during press fitting. If the tolerance is too loose, the handle will spin free after 50 to 100 use cycles even you add thread locker on the mating surface. You also need to confirm the surface knurl pattern you specified can grip user’s palm firmly even with oily hands, not just look aesthetically appealing. Run a 20-person grip test with knurled sample prototypes, asking testers to hold the handle with 3kg of pulling force with both dry and oil coated palms, and mark if the handle slips at any point. You should also test if the anti-tarnish coating will not peel off after 200 times of rubbing with common hand sanitizer, since many users wipe their hand tools with disinfectant regularly in 2026.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/custom-brass-tool-handle-mass-production-cost-factors.html#suggestedAnswer-2",
            "datePublished": "2026-10-05T07:46:02Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.ok-tool.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "When you validate a supplier’s production capability, ask them to provide the actual cycle time for each brass tool handle part. The standard cycle time for a 120mm long brass tool handle with full knurl, through bore and chamfered ends is 78 to 92 seconds per part on a standard 3-axis CNC lathe. If a supplier quotes a cycle time shorter than 70 seconds, they are most likely using a higher feed rate that leaves micro cracks on the inner bore surface, which will expand under drop impact and cause premature failure. Their production line should have dedicated fixtures for this specific part, not use universal 3-jaw chucks for every batch, because universal chucks will cause 2 to 3% of parts to have concentricity error over 0.2mm, leading to uneven weight distribution and bad user feel. Confirm the production line has automatic loading mechanism installed, so the labor cost does not fluctuate sharply when you ramp up order volume to 50k units per year, avoiding unexpected price hikes 6 months after launch.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/custom-brass-tool-handle-mass-production-cost-factors.html#suggestedAnswer-3",
            "datePublished": "2026-10-05T07:39:13Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.ok-tool.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The achievable tolerance for custom brass tool handles on standard CNC equipment can go down to +/-0.02mm for critical dimensions, but non-critical dimensions such as outer diameter of the knurl section should be controlled at +/-0.1mm, which can cut machining cost by nearly 20% without hurting any functional performance. When designing the part, avoid adding any tiny engraved logo that is less than 0.3mm deep, because it will get worn out completely after 300 cycles of normal use. All sharp edges on the end face of the handle should be deburred to a 0.2mm radius, not left with manual burrs that will cut user’s palm. The surface finish of the non-knurled smooth section can reach Ra 0.8 after 2 steps of polishing, which is enough to get the premium look your marketing team targeted, and extra polishing to Ra 0.4 will add 25% to your total part cost with zero visible difference for end users.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/custom-brass-tool-handle-mass-production-cost-factors.html#suggestedAnswer-4",
            "datePublished": "2026-10-05T07:38:18Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.ok-tool.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For brass tool handle mass production, the baseline first pass yield for a mature process should be no lower than 96%, any supplier with a first pass yield below 92% will have to pass the extra rework cost onto you in the long run, even if their initial quoted price looks low. The most common bottleneck in brass handle production is knurl forming, 70% of non-conforming parts come from misaligned knurl patterns that do not sit evenly around the outer circumference. A mature process will add a vision inspection station after knurl machining, to reject parts with pattern offset larger than 0.15mm before moving them to polishing, which cuts down the total rework time by 40% and reduces wasted raw material. The process should also separate parts by weight automatically after machining, to make sure every handle’s weight stays within +/-5g of your target specification, so that every finished tool has consistent balance feel for end users.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/custom-brass-tool-handle-mass-production-cost-factors.html#suggestedAnswer-5",
            "datePublished": "2026-10-05T07:20:12Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.ok-tool.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "If your brass tool handle design uses a die casted process instead of full CNC machining, the expected die life for a high quality H13 steel mold is 80,000 to 100,000 shots, which can support your 3-year annual 50k order volume without needing full mold replacement. The mold steel should be hardened to 48 to 52 HRC, if the supplier uses cheaper P20 steel with hardness around 30 HRC, the mold will start to deform after 15,000 shots, leading to rough surface and uneven wall thickness on the finished parts. Regular mold maintenance every 20,000 shots will add 30% to the total mold service life, which reduces your long term tooling cost significantly. If the supplier quotes you a mold price that is 50% lower than the market average, they are most likely using second hand mold steel or skip the full hardening process, which will cause massive quality issues halfway through your mass production run.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/custom-brass-tool-handle-mass-production-cost-factors.html#suggestedAnswer-6",
            "datePublished": "2026-10-05T07:17:06Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.ok-tool.com/team/emily.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The gate location for a die cast brass tool handle should be placed on the non-functional flat end face of the part, not on the knurl section or the smooth outer grip surface. If the gate is placed on the outer surface, the leftover gate mark after trimming will require extra manual polishing that drives up labor cost and increases the risk of visible scratch defects on the finished part. The mold should have 2 cavities instead of 4 cavities for your pre-production sample and low volume initial run, because 4 cavity molds will have uneven molten brass flow during filling, leading to small pores inside the part that can not be detected until the drop test. The parting line should be aligned to the narrow edge of the knurl pattern, so it can be hidden after minor polishing, and will not be felt by end users when they hold the handle. Adding 2 small vent slots on the far end of the mold cavity will reduce the internal porosity rate by more than 80%, which improves the overall mechanical strength of the brass part.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/custom-brass-tool-handle-mass-production-cost-factors.html#suggestedAnswer-7",
            "datePublished": "2026-10-05T07:12:06Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.ok-tool.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "When you review the initial part drawing of your brass tool handle, make sure the inner bore has a minimum 1 degree draft angle, if the draft angle is zero or negative, the part will stick to the mold core during die casting, leading to scratches on the inner surface and even broken mold cores. The wall thickness of the handle should stay between 2mm to 4mm across the entire part, avoid any sudden wall thickness change that will cause uneven cooling and internal shrinkage holes after casting. If you have a deep engraved logo on the inner end face of the handle, add a 0.5mm radius at the bottom of every engraved character, which eliminates stress concentration that can cause the part to crack under strong impact. Removing any unnecessary undercut features on the part will reduce machining time by more than 30%, and cut total part cost by 15% without affecting the aesthetic or functional performance of the final product.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/custom-brass-tool-handle-mass-production-cost-factors.html#suggestedAnswer-8",
            "datePublished": "2026-10-05T07:11:10Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.ok-tool.com/team/daniel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Structure your OEM project milestones with clear, written checkpoints that both sides sign off before moving to the next stage. The first checkpoint is DFM review, which should be completed within 3 working days after the supplier receives your 3D drawing, to resolve all possible manufacturability issues before any tooling cutting starts. The second checkpoint is first article dimensional inspection, all 22 critical dimensions measured and documented with CMM equipment, before any pre-production batch parts are machined. The third checkpoint is 100-piece pre-production trial run, you will receive all parts and run full functional and environmental tests, before the supplier starts any 50k mass production order. Reserve 7 working days as buffer between each checkpoint, so you have enough time to resolve small issues without pushing the total project timeline past your Q3 2026 launch window. All change requests related to part dimensions, material grade or coating should be documented in a formal change order, and no adjustments should be made verbally, to avoid confusion and mismatched parts later in mass production.",
            "upvoteCount": 0,
            "url": "https://www.ok-tool.com/qa/custom-brass-tool-handle-mass-production-cost-factors.html#suggestedAnswer-9",
            "datePublished": "2026-10-05T07:02:39Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.ok-tool.com/team/michael.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.ok-tool.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.ok-tool.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Plastic Components Q&A", "item": "https://www.ok-tool.com/qa/plastic-components/"}          ,{"@type": "ListItem", "position": 4, "name": "What factors determine the cost of custom brass tool handles for mass production?"}
      ]
    }
]
```